Decking beams are designed with a very wide top flange giving more support to the plywood, and thereby reducing maintenance costs by extending the life of the plywood.
This is the most important part of shuttering. The quick action supplied by dropheads along with nuts and bolts, is designed to fit on standard props or adaptors for cuplock scaffolding.
Universal jacks are manufactured from both roll threaded pipes and high quality solid steel rods with deep square threads. These jacks allow difference in height to be maintained.
Infill beams are used to provide the transom support underneath the plywood. All standard sizes are manufactured, as well as any special sizes upon request. They have a wide top which gives more support for the plywood.
Drop forged steel clampls, Galvanized , suitable for Scaffolding pipe 112" ( 48.30 mm OD) Tubes. Standard : BS 1139 EN 74 Drop forged steel clampls, Galvanized , suitable for Scaffolding pipe 112" ( 48.30 mm OD) Tubes. Standard : BS 1139 EN 74
Drop forged steel clampls, Galvanized , suitable for Scaffolding pipe 112" ( 48.30 mm OD) Tubes. Standard : BS 1139 EN 74 Drop forged steel clampls, Galvanized , suitable for Scaffolding pipe 112" ( 48.30 mm OD) Tubes. Standard : BS 1139 EN 74
Drop forged steel clampls, Galvanized , suitable for Scaffolding pipe 112" ( 48.30 mm OD) Tubes. Standard : BS 1139 EN 74 Drop forged steel clampls, Galvanized , suitable for Scaffolding pipe 112" ( 48.30 mm OD) Tubes. Standard : BS 1139 EN 74