Manar Al Omran

Damman, United Arab Emirates

Early Striking:


Early Striking:

This system incorporates the concept of earlier striking, which enables removal of the slab formwork along with decking beams and infill (or, decking panels) while leaving the vertical support in position for the requirement longer duration. Drop head enables the early striking. This system is compatible for use with tubular scaffold staging or telescopic props with compatible load carrying capacity and stability criteria as per requirement.




Looking for Early Striking:?


Search


Contact Details

Manar Al Omran

KSA - Dammam - Dhahran Jubail Highway - Bin Hindi Tower, Damman, , United Arab Emirates

View Mobile No.