Post Buy Requirement
UI
United Arab Emirates
Add Review

Petrochemicals & Petroleum Products #2474509

SOLVENT BASED BITUMEN

DESCRIPTION
UIBPRIME-1 is manufactured from a blend of pure Bitumen with fast drying solvent, which evaporates quickly, to leave a continuous film, recoat able after 3 hours in black colour.

ADVANTAGES

Single Component

Quick Drying

High coverage rate

Excellent water retention for use as a curing compound

Excellent adhesion to most common building substances



USESFor priming concrete, masonry, metal, etc. Suitable for use as a priming coat before applying any bituminous coating or modified bitumen membrane in roof "Damp proofing and waterproofing" below or above ground level.

APPLICATION
All coating surface preparation is most important, all surfaces to be stable and thoroughly cleaned. The product maybe applied to slightly damp but not wet surfaces. The application will be by brush or spray depending upon shape of area and surface to be treated. Depending on spray equipment up to 10% white spirit can be added to facilitate spraying. The coverage is 8 - 10 meters per Litre on metal and smooth surface. 5-6 meters per Litre on concrete and rough surface. Drying time 3 hours 15 minutes to surface dry. Fit to take further coat in not more that 24 hours. The specific gravity is 0.88 + 0.05 @ 25 degrees Celsius.

STANDARDUIB PRIME 1 complies with drying time of Bs 3416 and water retention ASTM C158

STORAGEOne year in tightly sealed, undamaged container. It should be stored indoors under conditions applying to products with flash point of 38 degrees Celsius.

CLEANINGClean with kerosene or white spirit.

HEALTH & SAFETYFlashpoint for the product is 38 degrees Celsius, so it's a flammable material, in case of fire use dry powder, Carbon dioxide (CO2), foam. Do not smoke. Wipe off spillages immediately.


SKIN COATThe solvent may have a narcotic effect if in.haled or absorbed through the skin. Wear protective clothing and goggles storage.

PACKING20 Ltr Pails Code No: 030121200 Ltr. Drums Code No: 030122

BULK SUPPLIES:
Approximately.2000 Mt, capacity Bitumen storage tanks in Mafraq industrial area Abu Dhabi, having well equipped heating arrangement.
10x45 Mt, truck tankers are available to supply Bitumen within UAE and also to other gulf states as per customer's demand.
Bitumen of all penetration grade, viz grade 40/50, 60/70, 80/100, 85/100, etc always are available for bulk distribution.
In addition, all Bitumen cut backs like MC (Medium curing), RC (Rapid curing), and Bitumen emulsion, and other specialized products are blended and produced within the factory premises. Besides above, factory can produce and supply blown (oxidized) Bitumen in various grades such as 115/15 and 85/25 etc

View Complete Details

NORMAL BITUMEN EMULSION 50

DESCRIPTION

It is a non-fiberated, Anionic water based bitumen Emulsion. It is dark brown in colour and dries to a black flexible protective coating. The finish film is tough and water proof and forms a barrier to water and vapor transmission.

ADVANTAGES

Cold applied

Easy to apply

Chemical resistance

Economical in use

Multi purpose, serves both as a protective Coating and curing membrane

Adhere to wide range of materials including Concrete, steel, cork and wood



USES
UIB PROOF - NBE 50 is used as a general water proofer and damp proofing for all kinds of surfaces including concrete, brick etc. Also can be used as a vapor barrier coating. Protects fresh concrete from rapid evaporation of water and thus avoids formation of shrinkage cracks.
Metal protection; provide a vapor barrier for cold storage rooms etc.

APPLICATION

Note: Agitate before use. As settlement can occur, the drum should be rolled before decanting materials.

Surfaces to be coated must be clean and any sand, oil or grease contamination should be removed. The surface should be dry (or damp but not wet). If the surface is dusty, it should be primed with a coat of UIB PROOF - NBE 50 diluted with an equal quantity of cold clean water and allowed to dry.
UIB PROOF - NBE 50 can be applied by brush or spray equipment. One coat is sufficient when used as a curing compound for "Green" concrete. Two coats are needed when being used as a damp-proofing membrane.
It is recommended that one or two coats should be applied depending on the degree of the protection required. Allow a minimum 2 hours between coats. Apply a second coat at right angels and ensuring this is not less than 0.5 mm thickness. Drying time 1.5 hours @ 20 degrees Celsius and over coating time 2 hours minimum. The specific Gravity of the product is approximately 1.05

STANDARD

UIB PROOF - NBE 50 Complies with concrete curing requirements of ASTM c 309-93 when applied at the rate of 2 square meters per Liter.

STORAGE
UIB PROOF - NBE 50 has a shelf life of 12 months if stored in the shade below 45 degrees Celsius, under normal warehouse conditions.

CLEANING OF TOOLS

In water if wet. If dry, clean with kerosene or white spirit.

PACKING20 Ltr Pails Code No: 03021011200 Ltr. Drums Code No: 03021012

View Complete Details

CLAY FILLED BITUMEN EMULSIONS

Description.

Highly viscous Thixotropic Anionic - Clay filled Bitumen Emulsion formulated with quality Bitumen Emulsion, incorporate with stabilizers and thickening agent to provide easy application and durability. It is dark brown and it will be black in colour when dried.


ADVANTAGES

Cold applied

Water based non-toxic

Non-flammable

Resists attacks from chloride and Sulphate Ions

Asbestos free

USES

It is used to protect steel, concrete and masonry from attacks by Sulphate and Chlorides and many other moisture and atmospheric borne pollutions. It is also excellent emulsified asphalt used as a protective coat for built up roofs and other exposed surfaces.

APPLICATION
The surface which is being treated should be cleaned to remove dust, grease etc. and applied by brush, a roller or spray it by spraying equipment for large surfaces. The coverage of the surface is with accordance tothe specification requirements other- wise one-coat application rate is 8Ltr per square meter on metal or smooth surface. 2 Ltr per square meter on concrete. It will give result in D.F.T. of 0.6mm. Two coats should be applied at right angles to each other and allow the first coat to dry completely before the second coat.

DRYING TIMEDepends on application rate and climatic condition but should be between 2-3 hours @ 20 degrees centigrade.


STANDARDCBE 30 complies with ASTMD 1227-95 Type 3, class 1 or as per the customer's requirement of solid content 30%, 40%.

STORAGEIn sealed container away from direct sun light not less than I year

CLEANINGUsing water when wet. If it is dry, it should be cleaned with Kerosene or white spirits.

PACKING20 Ltr Pails ITEM CODE: 03032031200 Ltr Drums ITEM CODE: 03032032

View Complete Details

Rubberized Bitumen Emulsion

DESCRIPTION

Anionic latex modified Bitumen Emulsion, the total solid content is 60% minimum, Latex Rubber content of dry film 10% minimum. It is dark brown in colour, dries to form a black, the product also contains a quantity of bio- acid to inhibit the growth of bacteria and mould both in the product it self and subsequent to application, these properties impart excellent durability and water proofing characteristics.

ADVANTAGES

Cold applied

Single component

Water based-non-toxic

Highly extensible

Non-flammable

Resists attacks by chloride and Sulphat ions

Asbestos free



USES

For use of a damp proof membrane in sandwich construction as a general purpose water proofer for walls, floors, other structures, and as a vapor seal as well. It's also an effective adhesive and bonding agent for insulation boards, cork panels, etc. It's practically suitable where some movements of structure is expected, it exhibits much better permeability and elasticity characteristics, than similar, materials without latex.

APPLICATI0N

The surface to be treated, should be cleaned to remove dust, grease etc. Should be applied by brush, roller or by spraying equipment "for large surfaces". On concrete or other absorbent surfaces first applied a coat of UIB PROOF CBE 1

COVERAGE

The coverage of UIB PROOF RBE 6010 in accordance with specification requirements, otherwise 2 coats with application rate of 1 - 1 .5 Liters per meter will result in OFT of 0.77mm. The two coats shall be applied at right angels to each other, allowing the first coat to dry completely before applying the second.
All application should be continued up verticals to the existing damp proof course. Ensure the membrane is not punched or damaged during subsequent operations. Drying time 3 hours @ 20 degrees Celsius and over coat time not more than 24 hours. The specific gravity of the products is approximately 1.00

STANDARD

UIB PROOF RBE 6010 complies with concrete curing requirements of ASTM c 309-93 when applied at the rate of 1 .25 meters per litre.

STORAGE
UIB PROOF RBE 6010 has a life of 12 months if stored in shade below 45 degrees Celsius under normal conditions.

CLEANING
If the product dries it cannot be removed just with solvent like kerosene.

PACKING
20 Ur Pails Code No: 03033061200 Ur. Drums Code No: 03033062

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us

  • Rana A.a. (Union International Bitumen Co.l.l.c.)
  • Industrial Zone Abu Dhabi Uae
  • Share us via

( ! ) Warning: Cannot modify header information - headers already sent by (output started at /htmlcachedir2/dynamic-html-pages/eitempfilen/uae/company/union-international-bitumen/petroleum-products.htm:44) in /home/sgupta/exportersindia.com/htdocs/script-files/company-page/index.php on line 59
Call Stack
#TimeMemoryFunctionLocation
10.0007457896{main}( ).../index.php:0
20.02222024384include_once( '/home/sgupta/exportersindia.com/htdocs/script-files/country-vanity/country_index_page_common_script.php' ).../index.php:309
30.28142738648include_once( '/home/sgupta/exportersindia.com/htdocs/script-files/company-page/index.php' ).../country_index_page_common_script.php:282
40.28853679016header ( ).../index.php:59
ExportersIndia: 404 Error Found
404Oops! It seems this page is not available

We connect Buyers and Sellers

Tell us What you Need

Trending Categories

Find Suppliers by Region


View All Categories

Find Suppliers by Country

Waiting for permission
To search by voice, go to your browser settings and allow access to microphone

Allow microphone access to search with voice